Power System Market Planning Capacity Margin Probabilities Calculation
##plugins.themes.bootstrap3.article.main##
The loss of load expectation (LOLE) considered an acceptable security standard across most of the national electricity systems. In the present study, the LOLE is calculated. This means that the LOLE needs developing a model. The developed model serving to assesses the security of supply risks associated with the different electricity capacity margin levels, where the capacity margin is the level by which available electricity generation capacity exceeds the maximum expected level of demand. Then, the developed model updated on an annual basis. The annual update is helping to fulfill the Electricity Authority for planning, operation and control. The developed model will assess the system by calculating the capacity margin probability by combining both the generation and load models. The calculation of LOLE is an internationally accepted criterion in capacity adequacy. The results for the model of each region vary due to several factors, such as generation resource, load forecast, and forced outage rates (FOR). The estimation of the risk is economically optimal reserve margin to a number of case studies assumptions considered in the present study. The results help in future planning for the electric system operation and control. Furthermore, the study is helping to evaluate the implications of the obtained results for the electricity policy market to determine the best model for market design in the future.
Downloads
References
-
W. Choi, Y. Lee, Y. Kim, J. Choi, “Dissimilarities of Physical Meaning between Loss of Load Indices based on Load Curve Types”, IFAC Papers Online Conference Paper 51-28, pp. 546-551, 2018.
Google Scholar
1
-
I. S. Qamber, “Loss of Load Probability effect on Four Power Stations”, International Conference on Fourth Industrial Revolution: Industry 4.0, Transition & Capacity of GCC Countries, 19-21 February 2019, Organized by Bahrain Society of Engineers, Gulf International Exhibition Center, Gulf Hotel, Kingdom of Bahrain, 2019.
Google Scholar
2
-
M. Čepin, “Evaluation of the power system reliability if a nuclear power plant is replaced with wind power plants”, Reliability Engineering and System Safety, vol. 185, pp. 455-464, 2019.
Google Scholar
3
-
I. S. Qamber, “Loss of Load Probability effect on Four Power Stations”, Second Smart Cities Symposium, 24-26 March 2019, Organized by University of Bahrain and IET-UK, Kingdom of Bahrain, 2019.
Google Scholar
4
-
M. M. Othman, A. Mohamed, A. Hussain, “Available Transfer Capability Assessment Using Evolutionary Programming based Capacity Benefit Margin”, Electrical Power and Energy Systems, vol. 28, no. 3, pp. 166-176, 2006.
Google Scholar
5
-
M. J. A..Saleh, S. A. Abdulla, A. M. Altaweel, I. S. Qamber, “LOLP and LOLE Calculation for Smart Cities Power Plants”, IEEE Publication, 3ICT’19 Conference Proceeding, 2019 International Conference on Innovation and Intelligence for Informatics, Computing, and Technologies, 22-23 September 2019, University of Bahrain, Kingdom of Bahrain.
Google Scholar
6
-
F. Billimoria, R. Poudineh, “Electricity Sector Transition in the National Electricity Market of Australia: Managing Reliability and Security in an Energy-Only Market”, Oxford Institute for Energy Studies (University of Oxford), OIES Paper: EL 31, 2018. DOI: https://doi.org/10.26889/9781784671228.
Google Scholar
7